Keep materials, outstanding work and care records together at handover.

A useful handover record connects what was approved with what has been delivered. Use this checklist to prepare a joint review, identify open items and keep the documents needed to use and maintain the finished space.

Prepared by: MFABER · Content date:

01

Bring the approved references

Gather the final scope, relevant drawings, material or sample references and recorded changes. Compare against those documents, not against an earlier concept image. Separate work outside the agreed scope from work that was included but remains outstanding.

02

Record observations precisely

Give each item a room, component and reference photo where appropriate. Describe the observation without guessing its cause. Agree the next action, responsible contact and follow-up date. A kitchen note such as “drawer at island, item K04, requires adjustment” is more useful than “kitchen unfinished”.

03

Make ongoing use understandable

Ask for the applicable product care instructions and the agreed contact for questions. Check that supplied appliance documents and any separately agreed specialist records are accounted for. Do not operate, dismantle or test specialist installations yourself; the appropriate qualified team should handle technical checks.

MFABER / Your project worksheet

Your project worksheet

Use the sheet as a discussion record, not a technical certificate or automatic acceptance form. Keep a dated copy of the references and outstanding-item list. Record who will follow up and update the status after the agreed action is reviewed. Contractual acceptance and any specialist certification remain separate from this planning aid.

Download the blank worksheet (TSV)
Keep materials, outstanding work and care records together at handover.
CheckpointClarify in writing
Scope and changesFinal proposal, approved drawing revisions and recorded changes used for the review.
Materials and componentsInstalled fronts, worktops, hardware and other items compared with agreed references.
Visible completionRoom-by-room observations on included work, with component IDs and relevant photographs.
Specialist interfacesOutstanding connections, checks or documents to be addressed by the responsible qualified team.
Open-item recordOne item per line: location, observation, agreed action, responsible contact and follow-up date.
Care and product documentsApplicable cleaning and care instructions, product identifiers and documents supplied within the scope.
Follow-up and recordsContact route, review date, updated item status and any separately documented warranty information.

This tool supports an initial conversation and scope preparation; it does not replace a technical design, survey or contract. Mark unknown items as “to be confirmed”. Remove personal information and unnecessary address details before sharing.

Frequently asked questions

Is this checklist a completion certificate?

No. It is a preparation and record-keeping aid. It does not replace contractual acceptance, required specialist checks or project-specific documentation.

Should care instructions be the same for every surface?

No. Use the applicable instructions for the specific supplied product and finish. If the document or product reference is missing, ask for it before choosing a cleaning method.

MFABER BY MPANDO

From materials to execution. One accountable company.

MFABER is a brand of MPANDO GLOBAL AŞ.

We serve every country and city across Europe. Survey, logistics and installation are planned around your project scope.

Single-point responsibility applies to the services agreed in the proposal and contract. Materials, installation, inclusions and exclusions are defined at the outset.

Discuss your project